Gravel Calculator
Cubic yards, tons and bags of gravel for a path, driveway or base.
The right depth depends on the job. Ask your supplier or check your local code.
Covers settling, compaction and uneven ground.
Use the figure from your supplier. It changes with the material and how wet it is, so there is no default.
The volume is printed on the bag.
Examples: , ,
Enter length, width and depth to see how much gravel you need.
Short answer
Multiply the area by the depth, both in feet, to get cubic feet. Add extra for settling, then divide by 27 for cubic yards. To order by the ton, you need the weight per cubic yard from your supplier.
On this page
How do I use the gravel calculator?
- Pick a shape: Rectangle for a path or a pad, Circle for a fire pit base, or Known area if you already measured the space.
- Enter the measurements and the depth. You can type feet and inches together:
20,20.5and20' 6"all work. - Keep the extra at 10%, or change it.
- Read the cubic yards. For tons, type the weight per cubic yard your supplier gives you. For bags, type the bag size from the label.
How is the volume worked out?
Gravel is a volume: the area of the space times the depth of the layer. The depth is the finished layer, so the extra covers settling.
- Area of a rectangleArea = L × W
- Area of a circleArea = π × (D ÷ 2)²
- VolumeV = Area × d
- Total with extraTotal = V × (1 + x ÷ 100)
- WeightWeight = Total × p
- BagsBags = round up (Total ÷ B)
Round up means to the next whole number. Weight and bags show only when you enter p or B.
| Symbol | Meaning | Unit |
|---|---|---|
| L | Length of the space | ft (m) |
| W | Width of the space | ft (m) |
| D | Diameter of a round space | ft (m) |
| d | Depth of the finished layer | in (cm) |
| x | Extra for settling | % |
| p | Weight per volume, from your supplier | tons/yd³ (t/m³) |
| B | Volume of one bag, from the label | ft³ (L) |
Worked example
A path that is 20 feet by 10 feet, with a 3 inch layer and the default 10% extra.
| Shape | Rectangle |
|---|---|
| Length | 20' 0" |
| Width | 10' 0" |
| Depth | 3" |
| Extra for waste | 10% |
| Gravel needed | 2.04 yd³ |
|---|---|
| Without extra | 1.85 yd³ |
A common mistake
Ordering by the wrong measure. This calculator gives a volume, but many suppliers sell gravel by weight, and a ton is not a cubic yard. Ask how many tons make a yard of your product.
How far does a cubic yard go?
A cubic yard spreads thinner the shallower you lay it. This table is plain arithmetic: it works for any loose material, and it shows why a small change in depth changes the order so much.
| Depth | 1 yd³ covers | 100 ft² takes |
|---|---|---|
| 1 in | 324 ft² | 0.31 yd³ |
| 2 in | 162 ft² | 0.62 yd³ |
| 3 in | 108 ft² | 0.93 yd³ |
| 4 in | 81 ft² | 1.23 yd³ |
| 6 in | 54 ft² | 1.85 yd³ |
How do I order gravel by the ton or by the bag?
Quarries often sell gravel by the ton, while the calculator works in cubic yards. To change one into the other you need your supplier's weight per cubic yard. There is no default, because it changes with the stone and with how wet it is.
The calculator multiplies the exact volume, not the rounded number it shows. Tons from your own hand math with the rounded cubic yards can differ by a few hundredths. The table works through the path above with a weight per cubic yard we picked for the example. It is not a product figure.
Bags are the opposite: small jobs are sold in bags, and the volume of each bag is printed on it. The calculator divides your total volume by the bag volume and rounds up.
| Step | Result |
|---|---|
| Volume the calculator shows | 2.04 yd³ |
| Volume it multiplies | 2.037 yd³ |
| Weight the calculator shows | 2.85 tons |
| Shown yards × 1.4 | 2.86 tons |
| Bags | 110 |
How deep should gravel be?
It depends on what the gravel is for. Under a concrete slab, Quikrete says that for larger jobs, or where drainage is poor, you should dig deeper and add several inches of gravel or crushed stone to the base. For a path, a pad or a drive, the right layer depends on the traffic and the soil.
This guide gives no depth for those jobs, and the calculator has no default depth. Ask your supplier and check your local building code.
Frequently asked questions
How many cubic yards of gravel do I need for 1,000 square feet?
It depends on the depth. At 3 inches deep, 1,000 square feet takes 1,000 × 0.25 ft = 250 cubic feet, which is 9.26 cubic yards before any extra. At 6 inches it takes twice that. Enter your own area and depth above to get the exact number.
Should I add extra gravel?
Yes, a little. Loose gravel packs down when it is tamped, so the layer you end up with is thinner than the one you ordered, and the ground is rarely perfectly level. We start at 10%, our default and not a standard, and you can set anything from 0% to 25%.
How do I convert cubic feet to cubic yards?
Divide by 27. A cubic yard is 3 feet by 3 feet by 3 feet, which is 27 cubic feet. So 55 cubic feet is 55 ÷ 27 = 2.04 cubic yards.
Related calculators
- Concrete CalculatorCubic yards and bags for slabs, footings and columns.
- Square Footage CalculatorArea of a rectangle, circle, triangle or trapezoid, in square feet, yards and meters.
- Mulch CalculatorCubic yards and bags of mulch for beds, borders and tree rings.
- Retaining Wall CalculatorBlocks, caps and gravel for a segmental retaining wall.